CONDOMINIO 2 IMOLA (BO) - Energy efficiency and seismic risk reduction

BUILDING TYPE
Condominium consisting of 35 units
INTERVENTIONS CARRIED OUT
ENERGY EFFICIENCY
- thermal insulation of vertical opaque surfaces and roofing on common parts;
- installation of a 10.08 kW photovoltaic system and 12.28 kWh storage for the common parts;
- replacement of windows and doors on private parts;
- generator replacement of stand-alone systems on private parts.
Energy class before intervention: D
Energy class post intervention: A1
SEISMIC RISK REDUCTION:
- anti-tilt guards on the perimeter walls;
- structural node confinement systems.
BUILDING RENOVATION:
- Partial resurfacing of the outdoor area.
COMMISSIONED TECHNICIANS
Arch. Maria Rezza, Ing. Andrea Armaroli, Ing. Matteo Masolini
CONTRACTORS
Calanchetta Ristrutturazioni s.r.l., Nuova Mustang s.r.l., S.I.T. s.r.l.





